01. Conduct a blanking process on the floor surface of the construction point and mark the points where the panel is to be installed with two lines of ink..
02.Attach a support to the same line based on the footwork (2"x4") installed at the top and bottom according to the ink line.
03. The connection of the primary panel is filled with cement milk (cement 680: water 340) and the second panel is back filled with cement milk.
04. Using a wood wedge, fix the panel with the panel upright in line with the mounted phase and lower corrugated (2"x4") and insert a specially manufactured subsidiary material (zinc steel plate t=1.2) into the upper slab with Hilti. In this way, construct continuously on each panel.
05. In particular, secure the windows or doors with special rich materials (for securing steel plates and lower parts) when installing the lintel.
06. As a final step, the panel shall be absorbed with a plaid glass mesh and cement milk for the integration and structural rein -forcement of the panel’s connections and overall surface.
07.In particular, if it is an inner room, it is very good if it is finished with water-resistant paint for factories, schools, etc.
08. Construction completion photos