
01. Before the blistering concrete is installed

02. Equipment setting

03. Measurement Experiment Specific Gravity and Flower Value

04. Install Lightweight Foamed Concrete Forms and Spread them

05. Lightweight Foamed Concrete Filled

06. Casting completion and formwork completion (repeat 5 and 6 times)

07. Core operation

08. Field view after completion